Date: January 2018

Project duration: 20 days

Location: Ghana

Division: K&C Diving Ghana

Project type: Underwater civil engineering, Port- and waterway infrastructure

 

In January 2018, K&C Diving Ghana completed an SBM maintenance & repair project commissioned by Real Logistics & GMPS Oiltanking.The project involved a complete disassembly and assembly of both a Chinese latnern and a floating pipeline. There were various obstacles when we faced these works but due to serious commitment, forward thinking and definitive action at the right time the project was executed to the highest standard.

20180125_143927.jpg20180203_113537.jpg20180201_084246.jpg20180127_100912.jpg20180127_090729.jpg20180126_152309.jpg20180126_133049.jpg20180126_131808.jpg20180126_125249.jpg

Related Projects

  • SBM maintenance & hose replacement

    SBM maintenance & hose replacement

    In January 2018, K&C Diving Ghana completed an SBM maintenance & repair project commissioned by Real Logistics and GMPS Oiltanking.

    Read more

  • Renovation Vandamme lock Zeebruges

    Renovation Vandamme lock Zeebruges

    At the beginning of 2018 Jan De Nul started a project that involved a complete renovation of door 4 of the Vandamme lock in Zeebrugge. K&C Diving provides all diving assistance during the entire project.

    Read more

  • Conserving piles at Nuclear Power Plant Doel

    Conserving piles at Nuclear Power Plant Doel

    Commissioned by Kerncentrale Doel and with Herbosch-Kiere as contractor, K&C Diving realized an extensive coating project at the water intake of the Doel 1 & 2 nuclear power stations. The large tidal activity at this location in the Scheldt meant that this project could not possibly be realized with traditional painting systems and deemed this project as a real challenge.

    Read more

How can K&C Diving help you with your project?