Date: since January 2013

Project duration: several weeks on average

Location: Vopak, Albertkanaal

Division: K&C Construct

Project type:
Port and waterways infrastructure
Underwater civil engineering

For the creation or renovation of new or existing quay walls, K&C Diving built large, movable formwork frames. These constructions were entirely produced at the in-house workshop.

The formwork frames are then placed on the sheet pile walls, for making a quay wall buffer beam.

If you have a project that requires formwork frames, please contact K&C Diving without obligation.

 

Related Projects

  • Building formwork frames

    Building formwork frames

    For the creation or renovation of new or existing quay walls, K&C Diving built large, movable formwork frames. These constructions were entirely produced at the in-house workshop.

    Read more

  • Installation of cofferdams

    Installation of cofferdams

    One condition for drilling in quay walls or concrete banks below the water level is that the water side must be dry.

    Read more

How can K&C Diving help you with your project?

Contact us for a no-obligation consultation or a cost estimate.